The construction of the new space is now well under way. Our contractor wasted no time in getting the new materials into the second floor suite. The truck that delivered the supplies had an extendable crane arm. Pallet by pallet they used the crane to lift the supplies to a second floor window and slipped them inside. Within no time they had everything they needed in the new suite. A couple of days later they had most of the walls framed, the drop ceiling roughed in, and a solid start to running the electricity. When I stopped by to get a couple of photos, we found that the framing did not provide for a couple of essential doorways! Thankfully we were able to correct things before a lot of time and materials were wasted.